Starting a Nursing Home: Who Owns Licensing, Certification and Survey Readiness

Why the governing body, administrator and DON chain decides if you pass survey

Reviewed by NurseAdministrator.org TeamUpdated November 17, 202622 min read

What you’ll learn in this article…

  • A state license comes first; CMS certification never replaces it.
  • Under 42 CFR 483.70(d), the governing body appoints a state-licensed administrator.
  • New builds can exceed $200,000 per bed; many operators buy instead.

A nursing home cannot collect a dollar of Medicare or Medicaid money until its governing body has appointed a state-licensed administrator. That requirement sits in 42 CFR 483.70, and it is where the real work of opening a facility begins.

Every new nursing home clears two gates: state licensure (plus certificate of need in states that require one) and federal certification, the framing laid out in the CASRAI guide on starting a nursing home (https://casrai.org/guides/how-to-start-a-nursing-home). The chain from governing body to administrator to director of nursing has to exist in writing before a state surveyor walks in.

Cost estimates and construction schedules draw the attention. Survey readiness and a documented chain of accountability decide the opening date.

Two Gates, Not One: State Licensure vs. CMS Certification

Preparing hard for the federal survey does not excuse a facility from the first gate. The state licenses the building and the operator. The state survey agency then surveys the facility against federal standards. CMS and the state Medicaid agency decide whether it may be certified to receive Medicare and Medicaid payment. Three different actors, routinely confused for one.

What the regulation actually says

42 CFR 483.70(a) is short and blunt: "A facility must be licensed under applicable State and local law." Nothing in that provision excuses a facility from state licensure because it holds federal certification. Certification is a payment status, not a license. A facility can hold a Medicare provider agreement and still fall out of compliance with state licensure law, and a state can revoke a license from an operator that is already certified.

Where the requirements live

Part 483 Subpart B sets the requirements a long-term care facility must meet, including the administration section at 483.70. Part 431 Subpart N is a separate matter: it governs state programs for licensing nursing home administrators under Social Security Act sections 1903(a)(29) and 1908, and it requires that only nursing homes supervised by a state-licensed administrator may operate.1 Facility licensure and administrator licensure both matter to nursing leadership, and they are not interchangeable.

Start with the state survey agency

The order of steps and the paperwork differ from state to state. That makes the first call straightforward: contact the state survey agency and ask which application comes first, which local inspections or zoning approvals are required, and when a pre-certification survey can realistically be scheduled.

What goes wrong

A team that treats certification as a substitute for licensure tends to build out, hire and market before learning that the state license application requires a local fire marshal sign-off and documented verification of the administrator's license. Opening slips by months while payroll runs with no residents.

Licensure, Certification and Medicare/Medicaid Enrollment Side by Side

How does a state license differ from CMS certification and Medicare/Medicaid enrollment, and where do you verify each one? Licensure, certification and enrollment are three separate questions answered by three different offices, so verify each one at its primary source.

Start with the regulator

Begin with your target job posting or your state licensing board, then the state survey agency. Settle the terms first. A license is state permission to operate (the facility) or to practice (the administrator). Certification is federal program compliance, verified by a state survey. Enrollment is the payment relationship with Medicare and your state Medicaid agency. Confirm enrollment rules with CMS or the Medicaid agency before trusting any third-party comparison.

What to verify

  • Scope: What the facility license and the administrator license each authorize.
  • Exams: National and state-specific requirements for administrators.
  • Renewals: Continuing education cycles and facility license renewal dates.
  • Enrollment deadlines: When the Medicaid agency expects your application relative to the survey.

Read the data critically

CMS figures describe coverage, not credentials. Medicare reached 70.7 million beneficiaries in July 2026, with 51.1% in Medicare Advantage and other plans and 81.1% in Part D. CMS methodology draws institutional provider counts from the Provider of Services file and non-institutional counts from Part B claims, and the latter can repeat a provider across specialties and states. Neither is a count of licensed or certified workers.

Pay and workforce sources

For administrator pay, use the BLS Occupational Outlook Handbook for medical and health services managers, then OEWS wage data filtered by state, metro area and industry. Program websites show completion trends and accreditation status. Professional associations publish workforce reports and employer surveys; check sample size, who funded the work and whether respondents were members only. Ask the institutional research office or association staff for unpublished data.

Certificate of Need: Which States Require It and How It Shifts Your Timeline

Can you open a nursing home without a certificate of need? It depends on the state: some bar any new nursing home beds without CON approval, others cap bed supply through moratoriums, and a CON review can add months (at least seven to ten in Washington, a full annual cycle in Indiana) before construction or licensing can begin, so contact the state health planning agency before you sign a lease or close on land, and see the CON oversight guide on nurseadministrator.org for a deeper read. CON laws change often, and the National Conference of State Legislatures tracks recent amendments in states such as Iowa, Maine, Tennessee, Virginia and West Virginia, so verify current status with the state agency before committing capital.

StateCON or moratorium status for nursing home bedsTypical review timelineRegulating agency
North CarolinaNo one may develop new nursing home beds without a certificate of needDecision within 150 days of the start of the designated review period; certificate issued 35 days after approval unless a contested case hearing is filedNorth Carolina Division of Health Service Regulation, Nursing Home Licensure and Certification Section
IndianaCON program for comprehensive care facilities (nursing homes), effective July 1, 2019Annual cycle from July 1 to June 30; applications accepted through July 31; decisions no later than April 30Indiana Department of Health
ConnecticutMoratorium on nursing facilities until July 1, 2027Generally within 120 days after a complete application is receivedConnecticut Department of Social Services
FloridaCON applications reviewed in cycles, with similar applications for the same service district considered together at least annuallyState Agency Action Report and Notice of Intent within 60 days after all applications in a cycle are complete; final order within 45 days after the recommended order is receivedFlorida Agency for Health Care Administration
WashingtonCON review applies to nursing home projects; state CON law recently amendedAt least seven to ten monthsWashington State Department of Health
South CarolinaCON review under Regulation 61-15; state CON law recently amendedDecision 30 to 90 calendar days after the review-cycle notice is published; if a public hearing is held, no later than 120 calendar days after affected persons are notified the application is completeSouth Carolina Department of Health and Environmental Control
MinnesotaMoratorium on nursing home bedsN/AN/A
New HampshireMoratorium on new intermediate care or skilled nursing beds and new skilled nursing facilitiesN/AN/A
South DakotaMoratorium on skilled nursing facilitiesN/AN/A
VermontMoratorium on new nursing facilities, licensed beds and capacity increases was set to run until July 1, 2022; confirm current status with the stateN/AN/A

The Governing Body, the Administrator and the DON: Building the Accountability Chain

A governing body is the person or group legally responsible for setting and carrying out a nursing home's management and operating policies. Under 42 CFR 483.70(d), every certified facility must have one, or must designate persons who function as one. That body appoints the administrator, who must be "Licensed by the State, where licensing is required." The administrator manages the facility day to day and answers to the governing body. The director of nursing sits one level below, running nursing services under the administrator's authority.

What Surveyors Look For

CMS guidance on this requirement (F837 in Appendix PP of the State Operations Manual) asks for an active, engaged governing body, not a name on a form. At entrance, surveyors request the names and contact information of the governing body. If concerns arise, they interview the administrator and, where possible, one or more governing body members.

CMS expects the facility to have worked out:

  • Reporting rhythm: how often and by what process the administrator reports to the governing body.
  • Significant information: what gets escalated, including survey results, abuse or neglect allegations and complaints.
  • Accountability content: audits, budgets, staffing and supplies.
  • Assessment role: how both parties take part in the facility-wide assessment.

The governing body is also accountable for the quality assurance and performance improvement program.

Your Task Before the Survey

Nursing leaders should write down who sits on, or acts as, the governing body, and how authority flows from that body to the administrator and then to the DON. A one-page chart plus meeting minutes or delegation records is a sensible start. Confirm the administrator's license status in the same file.

The weak point is a governing body nobody has documented. When a surveyor asks who is responsible for policy and the answers differ by person, that gap is visible immediately.

Who Can Own the Facility

Owners commonly hold a nursing home through an entity such as an LLC or corporation, and F837 counts owners and CEOs among those who may be the governing body. State rules on ownership disclosure and on who must be named as the licensee vary, so confirm both with your state survey agency before filing anything.

Administrator Licensure: Qualifications, NAB Exams and Hiring Before You Open

Hiring an administrator who already holds a license is faster than sponsoring someone through administrator-in-training hours, but either way the license has to be in place before you open. Federal rules say the governing body appoints an administrator who is "Licensed by the State, where licensing is required." In practice, every state licenses nursing home administrators, so treat this as a firm requirement.

The Typical Pathway

The National Association of Long Term Care Administrator Boards (NAB) writes the exams but does not issue licenses.1 Each state board sets its own rules, which can change without notice. The usual sequence is a bachelor's degree, supervised AIT or residency hours, then the NAB NHA and CORE exams, plus a state exam in some states.2

The states below show how much this varies:

  • California: Bachelor's degree, 1,000 AIT hours, minimum age 18, NAB exams plus a state exam.3
  • Texas: Bachelor's degree, 1,000 hours, NAB exams plus a state exam.4
  • Washington: Bachelor's degree and a 1,500-hour (nine-month) residency. The board must approve it before you start, and it must take place in a Washington-licensed nursing home. Applicants must be 21, and no separate state exam is listed.5
  • Maryland: Bachelor's degree, 2,080 hours, minimum age 21, NAB exams plus a state exam, and no temporary license.6

Maine asks for 1,040 hours with no separate state exam.7 Nebraska requires the NAB written exam and no state exam. Temporary licensure exists in California, Washington, Texas and Maine, but not Maryland.

Exam Logistics

As of 2026, NAB allows up to four attempts per exam cycle (July 1 to June 30, resetting each July 1).1 Its listed fee for the combined CORE and NHA is $455.1 State exam fees are separate. Confirm current figures with the board.

Verify Before the Survey

Check your administrator's license status directly with the state board well before the pre-certification survey. If you are recruiting from out of state, ask about reciprocity early, because the board may require additional steps or exams. Build hiring lead time into your opening timeline: a candidate who must complete a board-approved residency, or relocate and wait on a license transfer, can add months.

Our nursing home administrator guide on nurseadministrator.org covers the career path itself in more depth.

The Pre-Certification Survey: Working With Your State Survey Agency

What actually happens during the initial certification survey for a new nursing home? A state surveyor walks your building and tests your operations against federal requirements before Medicare or Medicaid will pay a dollar. For nursing leaders, the surveyor matters most: the state survey agency, not CMS alone, is the operational gatekeeper you deal with day to day.

Who Decides What

For a non-state-operated skilled nursing facility or nursing facility, the state surveys and certifies compliance or noncompliance, while the CMS location determines Medicare eligibility. State SNF certification is subject to CMS approval. For state-operated facilities, the state still surveys, but the CMS location makes the certification and participation determination.

What the Survey Covers

Under Part 483 Subpart B, the initial survey has three components:

  • Standard health survey: Evaluates resident health and safety practices across care delivery, staffing and the management structure your governing body put in place.
  • Life Safety Code review: Measured against NFPA 101, unannounced, and able to run independently of the health survey. It usually coincides with the health survey, but the state agency or an approved accreditation organization decides the timing.
  • Emergency preparedness: Nursing homes are among the 17 provider categories covered. Surveyors look for a risk assessment, policies and procedures, a communication plan, and training and testing, cited under Appendix Z E-tags.

Enrollment and Timing

Submit the CMS-855A to your Medicare Administrative Contractor early. It must be approved, not just filed, before the initial survey. The facility must also be operational and providing resident care when surveyors arrive, so you will be running with real residents before certification is final.

CMS materials set no universal number of days between application approval, survey and certification. Timing turns on application processing, operational readiness, survey scheduling and how quickly you correct deficiencies. Some state Medicaid agencies add their own requirements, and some states require a state survey before you may operate or admit anyone. Ask your state survey agency and Medicaid agency for their sequence in writing.

Name a Survey Readiness Owner

Document, before the surveyors call, who leads each response. A simple one-page matrix works:

  • Governing body: Owns management policies and the appointment of the licensed administrator.
  • Administrator: Coordinates the survey, the agency relationship and the plan of correction.
  • Director of nursing: Leads clinical, staffing and resident care evidence.

Put one named person at the top of that matrix, and give every surveyor question a known first responder.

From Idea to Certified Facility: What Is the Order of Operations?

Opening a nursing home means clearing state licensure first and federal certification second, with leadership accountability built in along the way. The sequence below is a typical path. Order and paperwork vary by state, so confirm each step with your state survey agency before committing resources.

Six-step path to opening a nursing home, from state licensing and certificate of need to CMS certification survey

What Opening a Nursing Home Really Costs

There is no single answer to how much money it takes to open a nursing home, but published figures put new construction above $200,000 per bed, which is why many operators choose to buy an existing facility. Licensing, consulting and pre-opening payroll costs depend heavily on your state and your consultants, so get local quotes for those. Budget for a working-capital cushion as well, because Medicare and Medicaid revenue does not start until certification is complete, and break-even occupancy depends on your market and payer mix.

Cost categoryTypical range or per-bed figureNotes
New construction (per bed)More than $200,000 per bedReported in 2024 industry coverage. Regional skilled nursing operators described new construction costs as prohibitive and development financing as unavailable.
New construction (per square foot)About $500 per square footReported in 2023 coverage of declining nursing home construction. Total cost depends on facility size, site and local labor markets.
Acquisition financingDebt at 75% to 85% loan-to-valueReported for skilled nursing buyers in 2024, with lower equity requirements than new development. Operators called acquisition the best avenue for growth.
Single-facility project example (Illinois)About $15,469 per bedRecorded in a 2016 Illinois Health Facilities and Services Review Board staff report for Transitional Care of Lisle. This is one older project, not a current benchmark for a new build.
Working capital during construction (HUD Section 232)5% of contract balances for work less than 90% completeIn HUD lender narratives, this came to roughly $317,800 on a $6,356,426 contract and roughly $325,100 on a $6,502,743 contract. Separate borrower working capital and operating-deficit reserves are also underwritten.
Break-even occupancyN/AHUD Section 232 underwriting includes break-even occupancy and operating-deficit fields, but sets them project by project. Plan for revenue to lag until the pre-certification survey and Medicare and Medicaid enrollment are complete.
Operating margin contextAverage of negative 17%Reported for U.S. nursing homes in 2023. A thin or negative margin leaves little room for a slow ramp-up, which is why lenders look closely at reserves.

Financing and Ownership Structures: HUD 232, SBA 7(A), Conventional Loans and Owner Equity

HUD's Section 232 program will insure a mortgage for acquisition, refinancing, new construction or substantial rehabilitation, but it sets a floor that catches first-time sponsors: the facility must have at least 20 beds, and the borrower must be a single-asset entity.

HUD 232 and SBA 7(a) at a Glance

  • HUD Section 232: loan terms from 10 to 35-40 years, capped at 75% of the property's remaining economic life. Public, proprietary and private nonprofit owners all qualify. The Express Lane version limits loan-to-value to 70% and mortgages to $50 million ($70 million in the greater New York City area), and it requires at least two years of operator tenure.1
  • SBA 7(a): up to $5 million for for-profit borrowers, real estate maturity of 25 years, an 85% guaranty on the portion up to $150,000 and 75% above that, and an interest rate cap of base plus 3.0% on loans over $350,000.2 The Small Loans version tops out at $350,000.

Acquisition Versus New Build

Lenders underwrite the two very differently. Buying a certified, occupied facility comes with census history, survey results and payer mix. A ground-up build brings a pro forma, and conventional lenders will want a sponsor with documented operating experience and a substantial equity position before they engage.

Structure and Disclosure

HUD expects a single-asset borrower, and sponsors running three or more facilities or borrowing $15 million or more should plan for master lease requirements.3 Separating the operating entity from the real estate is common, but it changes who holds the license. Before you finalize the structure, confirm with your state licensing board which entity or individual will appear as licensee: the federal rule ties the license to the facility, and the administrator your governing body appoints must hold a state license wherever the state requires one. Financing documents should name the same entity that sits in the accountability chain from governing body to administrator to director of nursing.

Nursing Home vs. Assisted Living: How the Pathway Differs

If you searched for how to open a care facility and landed here, the first question is which regulatory track you are actually on. Nursing homes sit under both state licensure and federal participation rules. Assisted living is generally regulated by states, with no federal certification equivalent. Because definitions vary, check how your state defines each facility type before you commit to a path.

FactorNursing HomeAssisted Living
Who licensesThe state licenses the facility under applicable state and local law, as 42 CFR 483.70(a) requires.The state sets and enforces licensing or certification requirements and regulates services and operations. The licensing agency differs by state.
Federal certificationApplies if you want Medicare and Medicaid payment. Facilities must meet 42 CFR Part 483 participation requirements.No federal certification equivalent. Assisted living is primarily state regulated, though some federal laws such as the Fair Labor Standards Act and OSHA requirements may apply.
Certificate of needNo federal CON requirement, but a state may require one to start or expand long-term-care services or beds.No uniform federal CON rule. Any approval requirements come from state licensing and certification rules.
Administrator requirementsSet in applicable law. The governing body appoints an administrator who must be state licensed where licensing is required.Each state sets its own rules for administrators or executive directors. In 2025, nine states (18 percent) changed administrator or director education and training requirements.
Survey typeThe state survey agency conducts a pre-certification survey as part of the federal certification process, then ongoing surveys.Oversight and inspections follow state licensing rules, so survey frequency and scope vary by state.
Degree of variationState rules layer on top of a uniform federal baseline.Wide variation. NCAL's review of every state and the District of Columbia reports differing scope-of-care limits, staffing and training rules.

Early Compliance Pitfalls and When to Bring in Professional Help

Where can you see what new nursing homes get cited for on a first survey? You will assemble the picture from several places at once, because no single national report isolates initial-certification results. Here is the lookup path.

Where to look

  • CMS.gov: The Survey & Certification resources and the Provider Data Catalog hold Form CMS-2567 statements of deficiencies, with F-tag, scope and severity, and correction dates.
  • HHS OIG (oig.hhs.gov): Its reports on nursing home survey quality found five deficiencies (pressure sores, accident hazards, dignity, housekeeping, highest practicable care) in at least 13% of sampled homes. That work is historical, so read it as direction, not a 2026 forecast.
  • Your state survey agency: It runs initial surveys and licensure. Ask what it sees most often and how far out it is scheduling.
  • State health care association (AHCA affiliate): Member benchmarking shows how peers perform.
  • BLS.gov: Local nursing labor data. A tight market raises your exposure to staffing citations such as F-725.

A repeatable method

Pull the CMS-2567s for three to five recently certified facilities near you. Sort every deficiency by F-tag family: infection control, care planning, food safety, life safety. Then compare the facilities against each other. A theme that shows up in three of five facilities is a pattern; one facility's bad survey is just luck.

Calibrate against the national repeat-deficiency counts, which are a proxy for recurring weak spots and not limited to new homes: food sanitation (254 facilities), care plans (221) and resident assessments (187) lead the list. Remember that a new facility must pass Life Safety Code, Standard Health and Emergency Preparedness surveys, and that surveyors cite observed practice, not policy binders. A plan of correction is due within 10 calendar days of a citation.

When to call for help

Bring in outside expertise when any of these appear:

  • The same deficiency theme repeats across your peer facilities.
  • Your state licensure timeline is slipping.
  • Life-safety code issues remain unresolved.

Before you hire, ask a prospective consultant three questions:

  • How many initial certification surveys have you supported in this state, and with which survey agency?
  • Will you test our systems through mock surveys, or only review our policies?
  • Who owns the plan of correction work once a citation lands?

A consultant who answers in specifics is worth the call.

Pre-Opening Readiness Checklist

Before you request the pre-certification survey, confirm that each item below is complete or clearly on track. Requirements and their order vary by state, so check the list against your state survey agency's expectations.

  1. State license in hand or on track
    Federal certification does not replace the state license. See Two Gates, Not One.
  2. Certificate of need resolved or confirmed not required
    Get CON approval or written confirmation that your state does not require it. See the CON table.
  3. Governing body documented
    Record who sits on or acts as the governing body and which management policies it owns. See The Governing Body, the Administrator and the DON.
  4. Administrator licensed and verified
    The governing body appoints the administrator. Verify the state license directly with the licensing board. See Administrator Licensure.
  5. Director of nursing hired
    Put the DON in place early so the chain from governing body to administrator to DON is documented before surveyors arrive.
  6. Policies and procedures in place
    Policies should be written, approved by the governing body and familiar to staff.
  7. CMS-855A and Medicaid enrollment submitted
    Program eligibility is decided by CMS and the state Medicaid agency, not by the license. See Licensure, Certification and Medicare/Medicaid Enrollment Side by Side.
  8. Life Safety Code and emergency preparedness ready
    Have the building, documentation and emergency plans ready for survey. See The Pre-Certification Survey.